Coiled Tubing and Other Stimulation Techniques
해외직수입Coiled Tubing and Other Stimulation Techniques : Formation Damage, Well Stimulation Techniques for Production Enhancement Paperback
도서정보
정가
86,300원
판매가
77,670원 (10% 할인)
저자
Mohammed Ismail Iqbal
출판사
River Publishers
발행일
2024-10-21   
ISBN
9788770043618
언어
영어
페이지수
372 쪽
사이즈
156*234 mm
무게
489 gr
배송정보
배송비
배송옵션에 따라 상이

상품정보

Good engineers never stop looking for opportunities to improve the performance of their production systems. Performance enhancement methods are always carefully examined, and production data is analyzed in order to identify determining factors affecting performance.The two main activities of the production engineer in the petroleum and related industries are reservoir stimulation and artificial lift. The classic solution to maximizing a well's productivity is to stimulate it. The basis for selecting stimulation candidates should be a review of the well's actual and theoretical IPR. Low permeability wells often need fracturing on initial completion. In low permeability zones, additional post stimulation production can be significant to the economics, however, the production engineer needs to make management aware of the true long term potential or else overly optimistic projections can easily be made.The main purpose of stimulation is to enhance the property value by the faster delivery of the petroleum fluid and/or to increase ultimate economic recovery. The aim of reservoir stimulation is to bypass near-wellbore damage and return a well to its “natural” productivity / injectivity, to extend a conductive path deep into a formation and thus increase productivity beyond the natural level and to produce hydrocarbon from tight formation.The importance of reservoir stimulation is increasing due to following reasons: • Hydrocarbon fields in their mid-life• Production in these fields are in declining trend• The thrust area: Enhancement of productionHence, to improve productivity of the well matrix stimulation and hydraulic fracturing are intended to remedy, or even improve, the natural connection of the wellbore with the reservoir, which could delay the need for artificial lift.This book presents procedures taken in the Oil & Gas Industry for identifying well problems, and it suggests means of solving problems with the help of the Coil Tube unit which is used for improving well productivity and techniques like Acidizing and Hydraulic Fracturing.


저자소개

R. Kalidoss, M. A. Bhagyaveni, K. S. Vishvaksenan

교환/반품 안내

반품/교환 방법 마이페이지 > 고객센터 1:1문의 작성 또는 고객센터 (02-322-2426)
반품/교환가능 기간 변심반품의 경우 수령 후 7일 이내, 상품의 결함 및 계약내용과 다를 경우 문제점 발견 후 30일 이내
파본 등 상품결함 시 '문제점 발견 후 30일(단, 수령일로 부터 3개월)' 이내
반품/교환비용 변심 혹은 구매착오로 인한 취소/반품은 판매가의 20% 취소수수료 고객 부담

* 취소수수료 : 수입제반비용(국내 까지의 운송비, 관세사비, 보세창고료, 내륙 운송비, 통관비 등)과 재고리스크(미판매 리스크, 환차손)에 따른 비용 등
단, 아래의 주문/취소 조건인 경우, 취소 수수료 면제
오늘 00시~06시 주문시 오늘 06시 이전 취소
오늘 06시 이후 주문 후 다음 날 06시 이전 취소
반품/교환 불가 사유 1) 소비자의 책임 있는 사유로 상품 등이 손실 또는 훼손된 경우 (단지 확인을 위한 포장 훼손은 제외)
2) 소비자의 요청에 따라 개별적으로 주문 제작되는 상품의 경우
3) 시간의 경과에 의해 재판매가 곤란한 정도로 가치가 현저히 감소한 경우
4) 전자상거래 등에서의 소비자보호에 관한 법률이 정하는 소비자 청약철회 제한 내용에 해당되는 경우
상품 품절 공급사(출판사) 재고 사정에 의해 품절/지연될 수 있으며, 품절 시 관련 사항에 대해서는 이메일과 문자로 안내드리겠습니다.
소비자 피해보상 환불 지연에 따른 배상 1) 상품의 불량에 의한 교환, A/S, 환불, 품질보증 및 피해보상 등에 관한 사항은 소비자분쟁 해결 기준에 준하여 처리됨
2) 대금 환불 및 환불지연에 따른 배상금 지급 조건, 절차 등은 전자상거래 등에서의 소비자 보호에 관한 법률에 따라 처리함
총 상품 금액 77,670
  • 할인율 10%계산
열기버튼

주문수량

총 상품 금액 77,670
닫기버튼

장바구니로 이동하시겠습니까?

배송정보 안내

  • 긴급배송

    • 긴급배송은 FedEx, DHL 등의 서비스를 이용.
    • 비용 40,000원 발생.
    • 출고 및 배송 기간은 약 14일 이내
  • 일반배송

    • 일반배송은 무료배송.
    • 출고 및 배송 기간은 30일 소요
로딩중...