Grand Central Terminal
해외직수입Grand Central Terminal : Railroads, Engineering, and Architecture in New York City Paperback
도서정보
정가
56,200원
판매가
50,580원 (10% 할인)
저자
Kurt C. Schlichting
출판사
Johns Hopkins University Press
발행일
2013-10-01   
ISBN
9781421411927
언어
영어
페이지수
264 쪽
사이즈
177*254*16 mm
무게
1 lb
배송정보
배송비
배송옵션에 따라 상이

상품정보

More than a history of a train station—the story of a city and an age, as reflected in a building aptly described as a secular cathedral.

Winner of the Professional/Scholarly Publishing Award in Architecture from the Association of American Publishers

Grand Central Terminal, one of New York City's preeminent buildings, stands as a magnificent Beaux-Arts monument to America's Railway Age, and it remains a vital part of city life today. Completed in 1913 after ten years of construction, the terminal became the city's most important transportation hub, linking long-distance and commuter trains to New York's network of subways, elevated trains, and streetcars. Its soaring Grand Concourse still offers passengers a majestic gateway to the wonders beyond 42nd Street.

In Grand Central Terminal, Kurt C. Schlichting traces the history of this spectacular building, detailing the colorful personalities, bitter conflicts, and Herculean feats of engineering that lie behind its construction. Schlichting begins with Cornelius Vanderbilt—"The Commodore"—whose railroad empire demanded an appropriately palatial passenger terminal in the heart of New York City. Completed in 1871, the first Grand Central was the largest rail facility in the world and yet—cramped and overburdened—soon proved thoroughly inadequate for the needs of this rapidly expanding city. William Wilgus, chief engineer of the New York Central Railroad, conceived of a new Grand Central Terminal, one that would fully meet the needs of the New York Central line. Grand Central became a monument to the creativity and daring of a remarkable age.

The terminal's construction proved to be a massive undertaking. Before construction could begin, more than 3 million cubic yards of rock and earth had to be removed and some 200 buildings demolished. Manhattan's exorbitant real estate prices necessitated a vast, two-story underground train yard, which in turn required a new, smoke-free electrified rail system. The project consumed nearly 30,000 tons of steel, three times more than that in the Eiffel Tower, and two power plants were built. The terminal building alone cost $43 million in 1913, the equivalent of nearly $750 million today.

Some of these costs were offset by an ambitious redevelopment project on property above the New York Central's underground tracks. Schlichting writes about the economic and cultural impact of the terminal on midtown Manhattan, from building of the Biltmore and Waldorf-Astoria Hotels to the transformation of Park Avenue. Schlichting concludes with an account of the New York Central's decline; the public outcry that prevented Grand Central's new owner, Penn Central, from following through with its 1969 plan to demolish or drastically alter the terminal; the rise of Metro-North Railroad; and the meticulous 1990s restoration project that returned Grand Central Terminal to its original splendor. More than a history of a train station, this book is the story of a city and an age as reflected in a building aptly described as a secular cathedral.


저자소개

Kurt C. Schlichting is the E. Gerald Corrigan '63 Chair in Humanities and Social Sciences at Fairfield University and a professor of sociology. He is author of Grand Central's Engineer: William J. Wilgus and the Planning of Modern Manhattan, and Waterfront Manhattan: From Henry Hudson to the High Line, also published by Johns Hopkins.

교환/반품 안내

반품/교환 방법 마이페이지 > 고객센터 1:1문의 작성 또는 고객센터 (02-322-2426)
반품/교환가능 기간 변심반품의 경우 수령 후 7일 이내, 상품의 결함 및 계약내용과 다를 경우 문제점 발견 후 30일 이내
파본 등 상품결함 시 '문제점 발견 후 30일(단, 수령일로 부터 3개월)' 이내
반품/교환비용 변심 혹은 구매착오로 인한 취소/반품은 판매가의 20% 취소수수료 고객 부담

* 취소수수료 : 수입제반비용(국내 까지의 운송비, 관세사비, 보세창고료, 내륙 운송비, 통관비 등)과 재고리스크(미판매 리스크, 환차손)에 따른 비용 등
단, 아래의 주문/취소 조건인 경우, 취소 수수료 면제
오늘 00시~06시 주문시 오늘 06시 이전 취소
오늘 06시 이후 주문 후 다음 날 06시 이전 취소
반품/교환 불가 사유 1) 소비자의 책임 있는 사유로 상품 등이 손실 또는 훼손된 경우 (단지 확인을 위한 포장 훼손은 제외)
2) 소비자의 요청에 따라 개별적으로 주문 제작되는 상품의 경우
3) 시간의 경과에 의해 재판매가 곤란한 정도로 가치가 현저히 감소한 경우
4) 전자상거래 등에서의 소비자보호에 관한 법률이 정하는 소비자 청약철회 제한 내용에 해당되는 경우
상품 품절 공급사(출판사) 재고 사정에 의해 품절/지연될 수 있으며, 품절 시 관련 사항에 대해서는 이메일과 문자로 안내드리겠습니다.
소비자 피해보상 환불 지연에 따른 배상 1) 상품의 불량에 의한 교환, A/S, 환불, 품질보증 및 피해보상 등에 관한 사항은 소비자분쟁 해결 기준에 준하여 처리됨
2) 대금 환불 및 환불지연에 따른 배상금 지급 조건, 절차 등은 전자상거래 등에서의 소비자 보호에 관한 법률에 따라 처리함
총 상품 금액 50,580
  • 할인율 10%계산
열기버튼

주문수량

총 상품 금액 50,580
닫기버튼

장바구니로 이동하시겠습니까?

배송정보 안내

  • 긴급배송

    • 긴급배송은 FedEx, DHL 등의 서비스를 이용.
    • 비용 40,000원 발생.
    • 출고 및 배송 기간은 약 14일 이내
  • 일반배송

    • 일반배송은 무료배송.
    • 출고 및 배송 기간은 30일 소요
로딩중...